000 00820nam a22002057a 4500
999 _c215919
_d215919
005 20251201152907.0
008 251128b ||||| |||| 00| 0 eng d
040 _aLC
_cUNZA
_dUNZA
_eRDA
099 _aTHESIS (M.ENG) MUS 2022
100 _aMusenge, Pathie Mutombo
245 _aDetermination of ultimate pit limits using maximum flow algorithim for Ford and Fulkerson :
_bthe case of North Mutoshi project in Kolwezi mining city, Democratic Republic of Congo /
_cPathie Mutombo Musenge.
260 _aLusaka:
_bThe University of Zambia,
_c2022.
300 _axii, 124 pages:
_billustrations.
500 _aMaster of Engineering in Mining Engineering.
504 _aIncludes bibliographical references.
650 _aFord and Fulkerson
650 _aLinear programming
650 _aGraph theory
942 _cTHESIS