| 000 | 00820nam a22002057a 4500 | ||
|---|---|---|---|
| 999 |
_c215919 _d215919 |
||
| 005 | 20251201152907.0 | ||
| 008 | 251128b ||||| |||| 00| 0 eng d | ||
| 040 |
_aLC _cUNZA _dUNZA _eRDA |
||
| 099 | _aTHESIS (M.ENG) MUS 2022 | ||
| 100 | _aMusenge, Pathie Mutombo | ||
| 245 |
_aDetermination of ultimate pit limits using maximum flow algorithim for Ford and Fulkerson : _bthe case of North Mutoshi project in Kolwezi mining city, Democratic Republic of Congo / _cPathie Mutombo Musenge. |
||
| 260 |
_aLusaka: _bThe University of Zambia, _c2022. |
||
| 300 |
_axii, 124 pages: _billustrations. |
||
| 500 | _aMaster of Engineering in Mining Engineering. | ||
| 504 | _aIncludes bibliographical references. | ||
| 650 | _aFord and Fulkerson | ||
| 650 | _aLinear programming | ||
| 650 | _aGraph theory | ||
| 942 | _cTHESIS | ||