000 | 00678nam a22001937a 4500 | ||
---|---|---|---|
999 |
_c215439 _d215439 |
||
005 | 20250829122235.0 | ||
008 | 250827b ||||| |||| 00| 0 eng d | ||
040 |
_aLC _cUNZA _dUNZA _eRDA |
||
099 | _aTHESIS (M.ENG) CHI 2021 | ||
100 | _aChibi, Esther | ||
245 |
_aInfluence of geological structures on slope stability and the final pit wall : _ba case study of chimiwungo open pit, Lumwana, Zambia / |
||
260 |
_aLusaka : _bThe University of Zambia, _c2021. |
||
300 |
_axiv, 106 pages : _billustrations. |
||
504 | _aIncludes bibliographical references. | ||
650 |
_aGeology _xStructures. |
||
650 | _aGeology | ||
650 | _aEngineering geology | ||
942 | _cTHESIS |