000 00643nam a22001697a 4500
999 _c212530
_d212530
005 20240213094235.0
008 240213b ||||| |||| 00| 0 eng d
040 _aLC
_cUNZA
_dUNZA
_eRDA
099 _aTHESIS (M.ENG) NGO 2021
100 _aNgoma, Kalunga
245 _aOptimisation of ore recovery factors and dilution control in sublevel open stopes at shaft number 4 Konkola mine, Zambia /
_cKalunga Ngoma
260 _aLusaka:
_bThe University of Zambia,
_c2021.
300 _axix, 129 pages:
_billustrations.
504 _aIncludes bibliographical references.
650 _aDilution and recovery
_xKonkola Copper Mine.
942 _cTHESIS