University Home | Library Home | Institutional Repository

Application of the modified Kuz-Ram model to minimize dillling and blasting operational costs at RP3 Chilanga cement Zambia limestone quarry/ Jules Mangozi Fundi

By: Material type: TextPublication details: Lusaka: The University of Zambia, 2022.Description: xiii,119 pages: illustrationsSubject(s):
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
Thesis and Dissertations Main Library Special collections THESIS (M.ENG) MAN 2022 (Browse shelf(Opens below)) C.1 Available 33729006792365

Includes bibliographical references.

There are no comments on this title.

to post a comment.
© 2026 - The University of Zambia Library - Koha v25.11