University Home | Library Home | Institutional Repository

Interim report on the proposed canalisation of the River Katonga. (Record no. 94143)

MARC details
000 -LEADER
fixed length control field 00606cam6a220020500 4500
001 - CONTROL NUMBER
control field tmp15784601
003 - CONTROL NUMBER IDENTIFIER
control field UPRA
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20190819083831.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 951027s1950 ug f eng u
035 ## - SYSTEM CONTROL NUMBER
System control number (Sirsi) r90915
035 ## - SYSTEM CONTROL NUMBER
System control number (UPRA)tmp15784601
040 ## - CATALOGING SOURCE
Transcribing agency UPRA
110 1# - MAIN ENTRY--CORPORATE NAME
Subordinate unit Public Works Dept.
Linkage A50300.1
245 10 - TITLE STATEMENT
Title Interim report on the proposed canalisation of the River Katonga.
246 30 - VARYING FORM OF TITLE
Title proper/short title Proposed canalisation of the River Katonga.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. [Entebbe,
Date of publication, distribution, etc. 1950]
651 #0 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name Katonga River, Uganda.
Linkage S39001.1
949 ## - LOCAL PROCESSING INFORMATION (OCLC)
a (O2) 1950/4
w lcc
m MAIN
t BOOK
l ON-SHELF

No items available.

© 2026 - The University of Zambia Library - Koha v25.11